{"id":63,"date":"2016-07-18T03:20:29","date_gmt":"2016-07-18T03:20:29","guid":{"rendered":"https:\/\/iesmartsystems.com\/?post_type=avada_portfolio&p=63"},"modified":"2024-03-26T15:55:47","modified_gmt":"2024-03-26T20:55:47","slug":"daikin-case-study-2","status":"publish","type":"avada_portfolio","link":"https:\/\/iesmartsystems.com\/portfolio-items\/daikin-case-study-2\/","title":{"rendered":"Daikin Case Study"},"content":{"rendered":"

Overview<\/div><\/div>
<\/div>
<\/div>
<\/div>
  • <\/i><\/span>
    \n

    Size: 4.1 MILLION SQUARE FOOT MANUFACTURING FACILITY<\/span><\/p>\n<\/div><\/li>

  • <\/i><\/span>
    \n

    SERVICES: DESIGN-BUILD, FIBEROPTICS, VOICE\/DATA SYSTEMS, A\/V SYSTEMS, SECURITY INFRASTRUCTURE<\/span><\/p>\n<\/div><\/li>

  • <\/i><\/span>
    \n

    GENERAL CONTRACTOR: DE HARVEY BUILDERS<\/span><\/p>\n<\/div><\/li><\/ul>

    <\/div><\/div><\/div>
    <\/div>
    <\/div>
    <\/div>

    One of the biggest challenges of Daikin’s 4.1 million square foot build-out was determining how each area of this site would be used. Beyond building a distribution center, the customer needed technology experts to guide them to what they needed.<\/p>\n<\/div>

    <\/div>
    <\/div>
    <\/div>

    DAIKIN PROJECT HIGHLIGHTS<\/span><\/p><\/h2><\/div>

    We’ve partnered with customers during the construction-programming phase for many large-scale projects, but this one was the largest build-out by far. i.e.Smart Systems presented Daikin with hundreds of conceptual schematics and products for its three-quarter mile facility. This involved stepping through different scenarios and budgets with the general contractor and the end-user.<\/p>\n

    Through this close partnership, Daikin was able to select a plan that included:<\/p>\n

      \n
    • Fiberoptic Information Transport Systems, for operational efficiency<\/li>\n
    • Voice and Data Systems<\/li>\n
    • Audio Visual Systems<\/li>\n
    • Security Infrastructure, including installation of wireless access points<\/li>\n<\/ul>\n

      Because i.e.Smart Systems is licensed in the state of Texas, we were also asked to install Electronic Safety and Security mechanisms including access control for vendors.<\/p>\n

      The entire Daikin project was completed within the proposed 2-year timeframe, within budget, and with 0 accidents. i.e.Smart Systems provides all of its customers with a Lifetime Craftsmanship Warranty.<\/p>\n<\/div>

      <\/div>
      <\/div>
      <\/div>
      <\/div><\/div><\/div><\/div><\/div>
      \n
      \n \"Conference\n \n
      \n
      Conference and Technology Spaces<\/h5>\n <\/span>\n <\/div>\n \n \n<\/div>\n
      \n \"Daikin\n \n
      \n
      Daikin Office Exterior<\/h5>\n <\/span>\n <\/div>\n \n \n<\/div>\n
      \n \"4.1\n \n
      \n
      4.1 Million Sq Ft Facility<\/h5>\n <\/span>\n <\/div>\n \n \n<\/div>\n
      \n \"Customer\n \n
      \n
      Customer Experience Showroom<\/h5>\n <\/span>\n <\/div>\n \n \n<\/div>\n
      \n \"Customer\n \n
      \n
      Customer Experience Showroom<\/h5>\n <\/span>\n <\/div>\n \n \n<\/div>\n
      \n \"Daikin\n \n
      \n
      Daikin Technology Experience<\/h5>\n <\/span>\n <\/div>\n \n \n<\/div>\n\n<\/div>\n\n<\/div>
      <\/div><\/div><\/div><\/div><\/div>